Road closures imminent:
1) Sharpenhoe Road, Barton Le Clay which extends from the roundabout with Bedford Road, Barton to Barton Road, Sharpenhoe
2) Barton Road, Sharpenhoe which extends from Sharpenhoe Road, Barton Le Clay to Sharpenhoe Road, Sharpenhoe to Streatley.
These temporary closures are required to enable surfacing works to take place and shall apply to such extent as may from time to time be indicated by the appropriate traffic signs. Where possible access will be maintained to property and premises but may be restricted from time to time according to local signing.
It is expected that the works will take place on Monday 29 November and Tuesday 30 November 2010 between 8.00am and 6.00pm.
The alternative routes available for vehicles affected by the proposed Order are:-
From roundabout proceed south on Bedford Road then Luton Road joining A6 and continue on A6 to roundabout with Church Road, Streatley. Take 2nd exit and continue on Church Road turning right on Sharpenhoe Road to junction with Sundon Road. Turn left and continue on Sundon Road, Streatley then Manor Road to junction with Church Road, Sundon. Turn right and continue to junction with Common Lane. Turn right on Common Lane, Harlington Road, Sundon and then Sundon Road, Harlington to crossroads with Station Road/Westoning Road, Harlington. Proceed on Westoning Road to junction with Goswell End Road. Turn right and continue on Goswell End Road to junction with Harlington Road and site and vice versa except from A6 roundabout, continue on A6 to off slip road to Barton. Turn left and continue on Luton Road, Barton rejoining the diversion route.
The proposed Order will come into operation on 29 November 2010 for a period of four months or until the proposed works have been completed, as detailed above, whichever is the earlier.
For further information please contact Central Bedfordshire Highways, Tel: 0300 300 8049
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment